Description
Reliable Power in a Compact Design - The WP1223A Lead-Acid Battery
This 12V 2.1Ah sealed lead-acid battery delivers dependable power in a sleek, flat form factor. Its side-mounted terminals allow for convenient cable routing and space-saving installation. Perfect for applications where a slimmer profile is required.
Compact yet Mighty:
- Rated at 12V 2.1Ah for ample capacity
- Approx. dimensions of just 180 x 23 x 60mm for a low-profile fit
- Lightweight at around 0.726kg for easy handling
Built to Last:
- Rugged sealed lead-acid construction
- Valve-regulated design for safety and leak-proof operation
- Designed for long service life in cyclic applications
Whether powering backup systems, mobility products, or any other 12V application, the WP1223A delivers portable power in a space-efficient package. Trust this slim, maintenance-free battery as your reliable energy solution.
Codes: BATT/399013 WP1223A